Revízia bezpečnostnej správy EBO34, 2013

Bezák P, Daniška V, Zachar M, Vaško M, Ondra F, Prítrský J, Hajková E, Hrnčíř T, Pánik M, Matejovič I, Drobná B (2013). Revision of EBO 34 NPP Safety Report Related to Project „Long-term Operation of V2 NPP“, study, TED/STD/VUJE/SK/005/13, May 2013.

Plán nakladania s RAO a VJP 2013

Matejovič I, Bezák P, Mršková A, Prítrský J, Hrnčíř T, Pánik M (2013). Plan of Management of Radioactive Waste, Spent Fuel Including Their Transport, study, TED/VYR/VUJE/EN/020/11, April 2013.

PpBS VICHR 2013

Vaško M, Bezák P, Ondra F, Pánik M, Hrnčíř T, Zachar M, Matejovič I (2013). Preliminary Safety Report for Vitrification of Chrompik III on VICHR Facility, Chapter 7 – Safety Analysis Report, Chapter 13 – Impact on the Environment, Chapter 15 – Decommissioning Procedures of VICHR Facility, safety report, TED/STD/VUJE/SK/026/12, March 2013.

CONRELMAT – záverečná správa 2013

Daniška V, Bezák P, Vaško M, Ondra F, Zachar M, Novák M, Prítrský P, Hrnčíř T, Pánik M, Hajková E, Matejovič I, Mršková A, Hornáček M, Slimák A, Cibula M, Juhár P, Pajerský P, Nečas V (FEI STU) (2013). Project CONRELMAT – Final Detailed Research Report, TED/STD/MS/SK/003/13, January 2013.

CONRELMAT – dlhodobý vplyv v GoldSime 2013

Prítrský J, Pánik M, Hrnčíř T (2013). Modelling of Long-term Impact of Conditionally Released Materials on the Environment Using GoldSim Code, partial final report within CONRELMAT project, TED/STD/DEC/SK/001/13, January 2013.

Cernavoda costing – Kinectrics 2013

Daniška V, Zachar M, Hajková E, Bezák P (2013). Cernavoda Costing Report Detailed, purchase order No. 280022812, Kinectrics Inc., January 2013.

Douglas Point – cost estimate 2012

Zachar M (2012). Douglas Point Nuclear Generating Station – Decommissioning Cost Estimate, file: K-421062-00003 R00, calculations, December 2012.

Komparatívna štúdia TTSK-Burgenland 2012

Prítrský J, Hrnčíř T, Pánik M (2012). Comparative Study of Burgenland and TTSK Energy Safety, study, TED/STD/TTSK/EN/011/11, May 2012.

Štúdia realizovateľnosti NJZ – Vodné hospodárstvo 2012

Bezák P (2012). Feasibility Study and Baseline Studies for the New NPP Project in Jaslovské Bohunice Site, CP5.8 – Chapter 2.3.2 Feasibility Study „Water management“, study, TED/STD/VUJE/EN/013/12, April 2012.

Štúdia realizovateľnosti NJZ – Vodohospodárske objekty a zariadenia 2012

Bezák P (2012). Feasibility Study and Baseline Studies for the New NPP Project in Jaslovske Bohunice. CP5.6 – Proposal of Water Management Buildings and Facilities for Operation of New NPP in Jaslovske Bohunice locality, study, TED/STD/VUJE/SK/010/12, March 2012.

Hodnotenie ožiarenia 2011

Ondra F (2011). Evaluation of Assumed Personal Exposure, study, TED/STD/VUJE/EN/018/11, December 2011.

Ocenenie nákladov – Medzisklad VJP Studsvik 2011

Vaško M, Bezák P, Zachar M, Daniška V, Ondra F (2011). A Cost Assessment of Intermediate Storage for Spent Fuel in Studsvik, final report, TED/STD/SKI/EN/015/11, November 2011.

IPPA Deliverable 2.4 2011

Mihók P (MBU), Mršková A (2011). IPPA Deliverable 2.4 – Review of Public Participation in SEA and EIA Procedures in the Nuclear Sector in Slovakia, study, TED/STD/EC/EN/025/11, October 2011.

CND 2010

Daniška V (2010). CND – Co-ordination Network on Decommissioning of Nuclear Installations, final reports, TED/STD/EC/EN/024/10, November 2010.

Yellow Book – manuál 2010

Rehák I, Vaško M, Ondra F (2010). Yellow Book Users’ Manual, Update of a Proposed Standardized List of Items for Decommissioning Costing Purpose, Tender No. TREN/H2/290-2009, Partial Document, TED/STD/EC/EN/011/10, November 2010.

Projekt B6.3 2010

Daniška V, Novák M, Bezák P, Ondra F, Vaško M, Hajková E, Rehák I, Dechet L, Zachar M (2010). Project B6.3 – The V1 NPP Decommissioning 1st Stage Plan & Other Licensing Documentation BIDSF 012 4 001, D5 – Decommissioning Concept for the Period After the Conclusion of the Decommissioning Stage to be Authorised, TED/STD/JAVYS/EN/010/10, October 2010.

Ocenenie nákladov – Isotope Centre, Studsvik 2010

Vaško M, Novák M, Daniška V, Lindskog S (SKI), Ondra F, Bezák P, Rehák I, Zachar M (2010). On Cost Estimate for Decommissioning of the Isotope Centre, study, TED/STD/SKI/EN/012/10, June 2010.

Odborný posudok – výstavba EMO 2010

Salzer P, Matejovič I, Daniška V (2010). Nuclear Power Plant Mochovce WWER 4 X 440 MW – 3rd Construction, Expert Appraisal of Proposed Activity, TED/STD/SE/SK/001/10, March 2010.

PSR RÚ RAO – projekt JZ 2009

Prítrský J (2009). Periodical Safety Review of National Repository of RAW in Mochovce, Project of Nuclear Installation, safety report, TED/STD/VUJE/SK/015/09, November 2009.

PSR RÚ RAO – prevádzková bezpečnosť 2009

Prítrský J, Salzer P (2009). Periodical Safety Review of National Repository of RAW in Mochovce, Operation Safety, safety report, TED/STD/VUJE/SK/011/09, November 2009.

PpBS Medzisklad VJP Bohunice 2009

Prítrský J, Salzer P, Matejovič I, Rehák I, Novák M (2009). Preliminary Safety Report of Interim Storage for Spent Nuclear Fuel in Jaslovske Bohunice, given chapters of safety report, TED/STD/VUJE/SK/016/09, October 2009.

Skladovanie PRAO Ignalina 2009

Rehák I, Salzer P (2009). Storage of Solid Radioactive Waste at Ignalina NPP, given chapters of safety report, April 2009.

Drenáž PDS 2009

Bezák P, Ondra F, Novák M, Rehák I, Vaško M, Zachar M (2009). Drainage of PDS Containing Dowtherm and Dowtherm Sludge, safety report, TED/STD/VUJE/SK/003/09, February 2009.

Preskladnenie chrompiku III 2009

Bezák P, Ondra F, Novák M, Rehák I, Vaško M, Zachar M (2009). Change of Chrompik III Storage Tank (from MSN to NPN), safety report, TED/STD/VUJE/SK/002/09, February 2009.

Aktualizácia nákladov EMO34 2009

Daniška V, Novák M, Ondra F, Bezák P, Vaško M, Zachar M (2009). Update of Cost Estimation for Decommissioning of EMO 3,4 NPP, study, TED/STD/SE/SK/001/09, January 2009.

Metodika oc. nákladov – ukončovanie prevádzky 2008

Ondra F (2008). Future Decommissioning Costs: Methodology for Description and Evaluation of Cost Profiles and Cost Structures during Transition Period, study, TED/STD/SKI/EN/002/07, April 2008.

Využitie skús. personálu V1 2008

Blažek J, Rehák I, Novák M (2008). Effective Utilization of Skilled V1 NPP Operation Personnel during the Transition Period, Preparation of Decommissioning and Decommissioning Stage of V1 NPP, study, TED/STD/VUJE/SK/014/07, February 2008.

Optimalizačná štúdia – vyraďovanie V1 2008

Daniška V, Rehák I, Novák M, Zachar M, Vaško M, Ondra F, Bezák P, Hajková E (2008). Optimization Study of V1 NPP Decommissioning, study, TED/VYR/JAVYS/SK/013/07, February 2008.

Vypočet nákladov a iných par. – Excel DEPEX 2008

Rehák I, Vaško M (2008). Code for Calculation of Costs and Other Decommissioning Parameters in Excel “DEPEX“, manual, TED/MAN/PAKS/EN/015/07, February 2008.

Integrálny sklad RAO 2008

Salzer P (2008). Update of Documentation of Integral RAW Storage, project documentation, TED/RAO/ENP/SK/008/07, February 2008.

Náklady vyraďovania Isotope Central Buliding, Studsvik, 2008

Vaško M, Daniška V, Rehák I, Bezák P, Ondra F, Zachar M, Krištofová K, Lindskog S (SKI) (2008). An Explorative Study of Cost Calculation of the Isotope Central Building with Emphasis on Definitions of Variables and Tentative Decommissioning Cost Calculation, study, TED/STD/SKI/EN/016/07, January 2008.

Plán vyraďovania PAKS 2007

Daniška V, Bezák P, Novák M, Vaško M, Ondra F, Zachar M, Krištofová K, Rehák I, Blažek J, Hajková E (2007). Preliminary Decommissioning Plan of PAKS NPP for Deferred Decommissioning Option with the Safe Enclosure of Active Buildings for Period of 20 years, supporting document, TED/STD/TSE/EN/009/07, December 2007.

Vyraďovanie bazénu dlhodobého skladu 2007

Daniška V, Ondra F, Bezák P, Rehák I, Novák M, Vaško M, Hajková E, Zachar M, Žatkulák M (VUJE), Urbanec M (VUJE) (2007). Updated Optimization study of Decommissioning of Long-term Storage Pool, study, TED/STD/INMART/SK/003/07, December 2007.

Inventárna databáza PAKS 2007

Bezák P, Zachar M, Daniška V (2007). Inventory Database for Paks NPP Updated Preliminary Decommissioning Plan, Sub-task of Paks NPP Updated Preliminary Decommissioning Plan, technical documentation, TED/STD/VUJE/EN/012/07, November 2007.

Výpočtová databáza PAKS 2007

Daniška V, Ondra F, Novák M (2007). Calculation Database for Paks NPP Updated Preliminary Decommissioning Plan, Sub-task of Paks NPP Updated Preliminary Decommissioning Plan, technical documentation, TED/STD/VUJE/EN/011/07, November 2007.

Plán vyraďovania PAKS – údržba a dozor 2007

Bezák P, Vaško M, Rehák I (2007). Preliminary Decommissioning Plan for PAKS NPP: Chapter 6 – Surveillance and Maintenance, study, TED/VYR/PAKS/EN/006/07, October 2007.

Plán vyraďovania PAKS – stratégia vyraďovania 2007

Daniška V, Rehák I (2007). Preliminary Decommissioning Plan for PAKS NPP: Chapter 3 – Decommissioning Strategy, study, TED/VYR/PAKS/EN/006/07, October 2007.

Plán vyraďovania PAKS – odhady nákladov a financovanie 2007

Daniška V, Rehák I (2007). Preliminary Decommissioning Plan for PAKS NPP: Chapter 8 – Cost Estimates and Financing Mechanism, study, TED/VYR/PAKS/EN/006/07, October 2007.

Plán vyraďovania PAKS – vyraďovacie aktivity 2007

Ondra F, Rehák I (2007). Preliminary Decommissioning Plan for PAKS NPP: Chapter 5 – Decommissioning Activities, study, TED/VYR/PAKS/EN/006/07, October 2007.

Úprava, sklad a likvidácia Cf-252 2007

Salzer P (2007). Conditioning, Storage and Disposal of Emitter 252Cf, study, TED/STD/JAVYS/SK/007/07, October 2007.

PpBS BSC RAO 2007

Matejovič I, Prítrský J (2007). Preliminary Safety Report for BTC RAW Jaslovske Bohunice, given chapters of safety report, TED/STD/RIA/SK/005/07, September 2007.

Plán vyraďovania PAKS – manažment odpadov 2007

Novák M, Rehák I (2007). Preliminary Decommissioning Plan for PAKS NPP: Chapter 7 – Waste Management, study, TED/VYR/PAKS/EN/006/07, September 2007.

Štruktúra databázy vyraďovania PAKS 2007

Rehák I, Vaško M (2007). Room Based Decommissioning Database Structure, Sub-task of Paks NPP Updated Preliminary Decommissioning Plan, study, TED/VYR/VUJE/EN/004/07, September 2007.

Plán vyraďovania PAKS – bezpečnostná analýza 2007

Vaško M, Rehák I (2007). Preliminary Decommissioning Plan for PAKS NPP: Chapter 9 – Safety Analysis, safety report, TED/VYR/PAKS/EN/006/07, September 2007.

RED-IMPACT – WP4, WP6 2007

Prítrský J, Ondra F (2007). RED-IMPACT, Impact of Partitioning and Transmutation and Waste Reduction Technologies on the Final Nuclear Waste Disposal, contribution to WP4 and WP6, TED/STD/VUJE/EN/001/07, February 2007.